Time-current curve analysis that isolates faults to the smallest section possible, protecting equipment, uptime, and life safety.

Overview

Selective coordination ensures that when a fault occurs, only the device immediately upstream of the fault trips. The rest of the facility stays online. We plot time-current curves for every protective device in the distribution network, identify coordination gaps, and recommend setting changes to restore selectivity, including the 0.1-second selectivity requirement for emergency, legally required standby, and critical operations systems under NEC 700, 701, and 708.

What's included

Scope of work

TCC plotting for every protective device on the studied feeders

Selective coordination evaluation between upstream and downstream devices

NEC 700.32 / 701.27 / 708.54 evaluation for emergency, LRS, and COPS systems

Setting recommendations for adjustable trip breakers and relays

Damage curve overlay for transformers, cables, and motors

PE-stamped report with TCC plots and setting tables

Methodology

How the engagement runs

A consistent process means predictable timelines, fewer surprises, and a defensible record if anyone (AHJ, insurance, OSHA) asks how the work was done.

  1. 01

    Existing-condition data

    Protective device makes, models, and as-found settings captured from the field along with conductor and transformer data.

  2. 02

    TCC plotting

    Curves plotted in ETAP or EasyPower with damage curves overlaid.

  3. 03

    Gap analysis

    Each upstream/downstream pair evaluated for selectivity; any overlaps within the fault current range are flagged.

  4. 04

    Setting optimization

    Adjustable settings are tuned to restore selectivity while preserving equipment damage protection.

  5. 05

    Report

    Final TCC plots, recommended settings table, and PE-stamped summary delivered.

Stamped

100%

Every deliverable PE-stamped by a licensed engineer in the project state. Across all 24 registered states.

Response

1 day

We respond to every inquiry within one business day with a scoped proposal and a real timeline.

Veteran-owned

VOSB / SDVOSB

SAM.gov registered. UEI H6HAZKAD4LJ7 · CAGE 08E02. Set-aside eligible.

When you need it

Triggers

  • New construction or service upgrade
  • Healthcare facility EPSS commissioning
  • Trip events that took out more of the facility than expected
  • Authority having jurisdiction (AHJ) request

What you receive

Deliverables

  • PE-stamped coordination study (PDF)
  • Time-current curve plots
  • Settings table for every adjustable device
  • List of devices needing replacement to achieve coordination