Overview

Classrooms, laboratories, athletic spaces, and campus support buildings place different demands on building systems. TPS coordinates heating, cooling, ventilation, plumbing, and electrical design with the facility program and the district or university’s capital plan. For renovations, we establish the available drawings, occupied areas, and work windows before defining the engineering assignment.

Building systems

MEP scope for education

Learning-space systems

Develop HVAC loads, ventilation, equipment selections, and plumbing layouts around occupancy and the planned use of the spaces. Coordinate equipment connections with the electrical design.

Campus electrical infrastructure

Review equipment loads, distribution, lighting, and emergency-power needs. Scope studies where existing or new equipment requires system analysis.

Phased improvements

Coordinate the MEP documents and model with the architectural team and the planned construction sequence. Identify design inputs needed for each issue milestone.

Scope the assignment

A clearer brief. A coordinated deliverable.

What to send us

  • Campus location, building use, and affected spaces
  • Room program, occupancy, and available plans
  • Existing equipment schedules and utility information
  • Academic calendar, access restrictions, and summer work windows
  • Capital-project phases and target review dates

What we can deliver

  • Building-system loads and equipment schedules
  • Coordinated MEP drawings and specifications
  • Defined power-study and utility coordination scope
  • Submittal, RFI, and field-observation support where included

We confirm disciplines, licensing, sealing, and deliverables for the project location before agreeing to the scope.

What makes this market different

Sector-specific challenges

Aging service equipment

Many school buildings run on switchgear that predates the current load. Short-circuit and arc-flash studies expose adequacy issues before someone gets hurt.

Athletic facility electrical complexity

Field lighting, scoreboards, broadcast feeds, and concession power create distinct electrical environments. We coordinate the full envelope.

Multi-phase construction

Capital improvements often happen building-by-building over multiple summers. Engineering needs to anticipate the full sequence.

Representative work

Representative project experience

Ohio

Troy City Schools: Troy High School

Electrical engineering for new school construction.

Kentucky

University of Kentucky: Athletic Facilities

Athletic facility electrical engineering.

Why TPS

What you get with TPS

→

Coordinated MEP design for institutional building needs

→

Electrical studies connected to equipment replacements and expansion

→

Engineering milestones aligned with the agreed capital-project sequence

Tell us about your next project.

Share your project location, available plans, and target schedule. We’ll follow up within one business day to discuss the scope and proposal inputs.