Tenant MEP design
Develop HVAC, ventilation, water, sanitary, lighting, and power requirements from the tenant plan and equipment schedule. Establish which systems belong to the tenant scope and which require landlord coordination.

Market
MEP design for retail fit-outs, building refreshes, and rollout programs, with electrical capacity studies and EV infrastructure where needed.
Overview
A retail fit-out or refresh has to connect the tenant’s requirements to the building that already exists. TPS coordinates HVAC, plumbing, lighting, power, and equipment connections with the architect, owner, and design-build team. For rollout programs, the starting point is a shared design brief with site-specific utility information, existing conditions, and local review requirements confirmed for each assignment.
Building systems
Develop HVAC, ventilation, water, sanitary, lighting, and power requirements from the tenant plan and equipment schedule. Establish which systems belong to the tenant scope and which require landlord coordination.
Review the available service and equipment information against the proposed loads. Define electrical study needs and utility interfaces before new equipment or EV charging is added.
Coordinate brand requirements with each building’s constraints and adopted requirements. Reuse the agreed design criteria while confirming the inputs and licensing for each location.
Scope the assignment
We confirm disciplines, licensing, sealing, and deliverables for the project location before agreeing to the scope.
What makes this market different
A national brand standard meets the local building inspector. We translate the brand spec into a permit set that satisfies each jurisdiction without breaking visual or operational consistency.
Stores stay open. Power has to come down only during after-hours windows, and the temporary distribution plan is part of the design, not an afterthought handed to the electrician on site.
New utility service for parking-lot DCFC stalls is a fault-current and coordination problem before it is a parking problem. We size the service for what is coming, not just what is there today.
A multi-store refresh program has to feed permits, materials, and crews on a predictable cadence. The engineering set is the gating item. We deliver in the program rhythm, not one-off.
Where to start
Coordinated mechanical, electrical, and plumbing design from concept through construction.
Building power, lighting, distribution, and equipment connections.
NFPA 70E-compliant studies with IEEE 1584-2018 calculations.
Fault current analysis and equipment rating verification.
Time-current curve analysis for protective device sequencing.
Representative work
Multi-state
Multi-location electrical engineering for national retail brand rollouts and refresh programs.
Why TPS
Mechanical, electrical, and plumbing coordination within the agreed scope
Shared design criteria with site-specific inputs and licensing review
Defined milestones for tenant, landlord, and construction-team coordination
Share your project location, available plans, and target schedule. We’ll follow up within one business day to discuss the scope and proposal inputs.