Power System Studies
Load Flow Analysis
Steady-state power-flow studies that verify voltage regulation, conductor sizing, and transformer loading at every operating mode.
Overview
Load flow tells you whether your facility will operate within design limits at every plausible loading and switching scenario: full-load summer peak, partial-load emergency mode, generator-only operation. We model the system in ETAP or EasyPower, evaluate voltage at every bus, transformer and cable loading at every branch, and identify violations of ANSI C84.1 voltage limits or thermal capacity before they manifest as field problems.
What's included
Scope of work
Full-load, partial-load, and emergency-mode load-flow cases
Voltage regulation evaluation at every bus per ANSI C84.1
Transformer, cable, and busway loading evaluation
Power factor and reactive demand assessment
Capacitor / reactor sizing recommendations
PE-stamped report with results tables and one-line annotations
Methodology
How the engagement runs
We agree on inputs, responsibilities, and deliverables before the work begins, then keep the design decisions connected through each stage.
Load Flow Analysis: how the engagement runs
- 1Load surveyInstalled and projected loads compiled by zone with diversity factors applied.
- 2Scenario definitionOperating modes defined: normal, generator-on-utility-off, partial bus, and so on.
- 3SimulationNewton-Raphson load flow run for each scenario in ETAP or EasyPower.
- 4Compliance reviewBus voltages and branch loading compared to ANSI C84.1, equipment ratings, and NEC ampacity.
- 5RecommendationsConductor up-sizing, tap-changer adjustments, or PF correction recommended where needed.
Engineering scope
Project-specific
Disciplines, deliverables, licensing, and sealing requirements confirmed for your project before work begins.
Response
1 day
We respond to every inquiry within one business day to discuss scope, next steps, and the information needed for a proposal.
Veteran-owned
VOSB / SDVOSB
SAM.gov registered. UEI H6HAZKAD4LJ7 · CAGE 08E02. Set-aside eligible.
When you need it
Triggers
- →New large load addition (chiller, VFD, EV charger bank)
- →Voltage complaints in specific zones of the facility
- →Pre-design phase of any major service or distribution upgrade
- →Microgrid or on-site generation feasibility study
What you receive
Deliverables
- PE-stamped load-flow report
- Bus voltage and branch loading tables for every studied case
- Annotated single-line diagram
- Sizing recommendations for any flagged equipment