Construction Support

MV Distribution

Medium-voltage distribution system design covering 5kV through 35kV, in primary loop and radial configurations.

Overview

Medium-voltage distribution is how power gets across large commercial campuses, industrial facilities, and substation-fed data centers. We design 5kV–35kV loop and radial systems with pad-mount and substation-grade switchgear, transformers, cable, terminations, and the protection that ties it all together, with full studies behind every decision.

What's included

Scope of work

Primary loop or radial topology selection

Switchgear and transformer specification

MV cable selection (shielded EPR / XLPE) and termination

Protection scheme: relays, fuses, recloser coordination

Grounding system design (high-resistance, solid, ungrounded)

Studies: load flow, short-circuit, coordination, arc-flash

Methodology

How the engagement runs

A consistent process means predictable timelines, fewer surprises, and a defensible record if anyone (AHJ, insurance, OSHA) asks how the work was done.

  1. 01

    Topology

    Loop vs radial selected on availability, maintainability, and cost.

  2. 02

    Equipment specification

    Switchgear, transformer, and cable specified to fit the studies and the service environment.

  3. 03

    Protection

    Relay or fuse scheme designed and coordinated; settings provided with the documents.

  4. 04

    Studies

    Load flow, short-circuit, coordination, and arc-flash run as a package.

  5. 05

    CDs

    Stamped one-line, plans, schedules, and specifications.

Stamped

100%

Every deliverable PE-stamped by a licensed engineer in the project state. Across all 24 registered states.

Response

1 day

We respond to every inquiry within one business day with a scoped proposal and a real timeline.

Veteran-owned

VOSB / SDVOSB

SAM.gov registered. UEI H6HAZKAD4LJ7 · CAGE 08E02. Set-aside eligible.

When you need it

Triggers

  • Industrial or campus capacity expansion
  • New primary service from the utility
  • Aging MV infrastructure replacement
  • Substation rebuild

What you receive

Deliverables

  • PE-stamped MV CD package
  • Full study package (load flow, short-circuit, coordination, arc-flash)
  • Equipment specifications and bid documents
  • Construction-phase RFI and submittal support

Ready to scope your mv distribution engagement?

Send us the basics (facility type, equipment, timeline) and we’ll respond with a scoped proposal within one business day.