Construction Support

Utility Coordination

Primary metering, interconnection agreements, and utility-side coordination, handled so you don’t have to chase it.

Overview

Every new service, capacity upgrade, or DER interconnection involves the serving utility. We act as your engineer-of-record interface with the utility: applications, service planning, primary metering coordination, transformer specifications, easement language, witness-test scheduling. Projects that get stuck are usually stuck on utility coordination; we keep them moving.

What's included

Scope of work

Service application and load letter preparation

Primary metering scheme coordination

Transformer specification and ownership negotiation

Easement and right-of-way coordination

Interconnection agreements (IEEE 1547 / FERC SGIA)

Witness-test scheduling and acceptance

Methodology

How the engagement runs

A consistent process means predictable timelines, fewer surprises, and a defensible record if anyone (AHJ, insurance, OSHA) asks how the work was done.

Utility Coordination: how the engagement runs

  1. 1Pre-app discovery
    Existing service review, available capacity confirmation, and tariff analysis before the application is filed.
  2. 2Application package
    Load letter, single-line, and supporting calculations prepared and submitted.
  3. 3Ongoing coordination
    Meeting cadence with utility planning and field engineering until energization.
  4. 4Witness test
    Schedule and attend the utility witness test; correct any findings.

Stamped

100%

Every deliverable PE-stamped by a licensed engineer in the project state. Across all 24 registered states.

Response

1 day

We respond to every inquiry within one business day with a scoped proposal and a real timeline.

Veteran-owned

VOSB / SDVOSB

SAM.gov registered. UEI H6HAZKAD4LJ7 · CAGE 08E02. Set-aside eligible.

When you need it

Triggers

  • →New service request
  • →Capacity upgrade or service relocation
  • →Solar PV, BESS, or genset interconnection
  • →EV fast-charging service request

What you receive

Deliverables

  • Service application package
  • Coordination meeting minutes and decision log
  • Final utility approval / interconnection agreement
  • Witness-test sign-off

Ready to scope your utility coordination engagement?

Send us the basics (facility type, equipment, timeline) and we’ll respond with a scoped proposal within one business day.