Overview
Adding fast chargers, rooftop or canopy PV, or behind-the-meter battery storage means new load (or new generation) on a system that wasn’t designed for it. We handle feasibility, load and capacity analysis, equipment selection, utility coordination, and the interconnection package across DCFC fleet depots, retail Level 2 deployments, commercial PV up to a few megawatts, and battery ESS for peak shaving or backup.
What's included
Scope of work
Site feasibility and capacity study
EV load forecast and demand-charge modeling
PV system layout, string sizing, and inverter selection
Battery ESS sizing for peak shaving, backup, or NEM offset
Service equipment sizing and switchgear specification
Utility interconnection application package
NEC 625 (EV) / NEC 690 (PV) / NEC 706 (ESS) compliance documentation
Methodology
How the engagement runs
A consistent process means predictable timelines, fewer surprises, and a defensible record if anyone (AHJ, insurance, OSHA) asks how the work was done.
- 01
Feasibility
Site walk, existing service capacity review, and utility tariff analysis to confirm the project is buildable economically.
- 02
Design
Single-line, equipment schedules, and conduit/feeder routing developed with the architect or GC.
- 03
Utility coordination
Interconnection application, witness-test scheduling, and any required studies (Section 5.4 / impact study) managed end-to-end.
- 04
Permit and construction support
Stamped drawings for permit; RFI and submittal review during construction.
- 05
Commissioning
Acceptance testing protocols; PV system commissioning per NEC 690.4(B).
Stamped
100%
Every deliverable PE-stamped by a licensed engineer in the project state. Across all 24 registered states.
Response
1 day
We respond to every inquiry within one business day with a scoped proposal and a real timeline.
Veteran-owned
VOSB / SDVOSB
SAM.gov registered. UEI H6HAZKAD4LJ7 · CAGE 08E02. Set-aside eligible.
When you need it
Triggers
- →Fleet electrification or workplace charging mandate
- →Sustainability or carbon-reduction targets
- →Tariff structure that favors PF correction or peak shaving
- →Public DCFC corridor or Title 24 / IECC compliance need
What you receive
Deliverables
- PE-stamped construction documents
- Utility interconnection application package
- Equipment specifications and schedules
- Commissioning and acceptance protocols
Continue exploring
Related services
Ready to scope your ev & renewable infrastructure engagement?
Send us the basics (facility type, equipment, timeline) and we’ll respond with a scoped proposal within one business day.