Electrical Engineering & Design

EV & Renewable Infrastructure

EV charging, solar PV, and battery energy storage projects, from feasibility through utility interconnection.

Overview

Adding fast chargers, rooftop or canopy PV, or behind-the-meter battery storage means new load (or new generation) on a system that wasn’t designed for it. We handle feasibility, load and capacity analysis, equipment selection, utility coordination, and the interconnection package across DCFC fleet depots, retail Level 2 deployments, commercial PV up to a few megawatts, and battery ESS for peak shaving or backup.

What's included

Scope of work

Site feasibility and capacity study

EV load forecast and demand-charge modeling

PV system layout, string sizing, and inverter selection

Battery ESS sizing for peak shaving, backup, or NEM offset

Service equipment sizing and switchgear specification

Utility interconnection application package

NEC 625 (EV) / NEC 690 (PV) / NEC 706 (ESS) compliance documentation

Methodology

How the engagement runs

A consistent process means predictable timelines, fewer surprises, and a defensible record if anyone (AHJ, insurance, OSHA) asks how the work was done.

  1. 01

    Feasibility

    Site walk, existing service capacity review, and utility tariff analysis to confirm the project is buildable economically.

  2. 02

    Design

    Single-line, equipment schedules, and conduit/feeder routing developed with the architect or GC.

  3. 03

    Utility coordination

    Interconnection application, witness-test scheduling, and any required studies (Section 5.4 / impact study) managed end-to-end.

  4. 04

    Permit and construction support

    Stamped drawings for permit; RFI and submittal review during construction.

  5. 05

    Commissioning

    Acceptance testing protocols; PV system commissioning per NEC 690.4(B).

Stamped

100%

Every deliverable PE-stamped by a licensed engineer in the project state. Across all 24 registered states.

Response

1 day

We respond to every inquiry within one business day with a scoped proposal and a real timeline.

Veteran-owned

VOSB / SDVOSB

SAM.gov registered. UEI H6HAZKAD4LJ7 · CAGE 08E02. Set-aside eligible.

When you need it

Triggers

  • Fleet electrification or workplace charging mandate
  • Sustainability or carbon-reduction targets
  • Tariff structure that favors PF correction or peak shaving
  • Public DCFC corridor or Title 24 / IECC compliance need

What you receive

Deliverables

  • PE-stamped construction documents
  • Utility interconnection application package
  • Equipment specifications and schedules
  • Commissioning and acceptance protocols

Ready to scope your ev & renewable infrastructure engagement?

Send us the basics (facility type, equipment, timeline) and we’ll respond with a scoped proposal within one business day.